Based on my research with 4-5 yurt companies, a yurt's floor needs to be laid before the yurt is set up. If I put down radiant floor mats, then the flooring, how do I put in the plumbing without damaging the mats?
Originally asked by Grammy2joo on Stack Exchange (diy) (CC BY-SA 3.0).